FCF Hazardous Energy Identified During Breaker Maintenance
6270 Views
Feedback
0 Comments

Favorite
Image for FCF Hazardous Energy Identified During Breaker Maintenance

Type:  Lessons Learned

Publisher:  Idaho National Laboratory, Idaho Falls, ID

Published As:  Public

Date: 

Topics:  Electrical, Hazardous Energy Control

During preventive maintenance on a 36M breaker, at the Material and Fuels Complex Fuel Conditioning Facility, two electrical breakers were inadvertently positioned in the shut position instead of the open position during the performance of a lockout/tagout. Both the initial positioner and verifier did not identify the discrepant position of the breakers. The problem was not identified during zero energy checks due to an in-series upstream breaker under a lockout/tagout for a different work package. Additionally, the work group that walked down the lockout/tagout for acceptance did not identify the problem. A step back for all electrical work related to the breaker preventive maintenance was directed by the shift supervisor prior to re-energizing power in the facility. The step back was invoked due to a concern related to the concurrent execution of large electrical work packages impacting the entire facility.

You must be logged in to open the attachment.

Download Article
Comments about this Article
You must be logged in to add or view comments.
Related Articles
Feedback Form
How did you apply this information?
You must be logged in to use this feature
Is this article applicable to your organization?