Drum Lid Restraints
4908 Views
Feedback
1 Comments

Favorite
Image for Drum Lid Restraints

Type:  Lessons Learned

Publisher:  URS CH2M Oak Ridge, Oak Ridge, TN

Published As:  Public

Date: 

Topics:  Nuclear/Nuclear Safety, Quality Assurance, Transportation and Packaging

A nonconformance report was issued against Drum Lid Restraints currently relied upon as a Design Feature to mitigate the consequences of an over-pressurization event, including a deflagration, associated with an unvented drum. The nonconformance report was reviewed as new information indicating that the Drum Lid Restraints may not meet the performance criteria for all expected drum deflagration conditions considered in the safety analysis. The information was based on additional testing performed by the manufacturer of the drum lid restraint in use.

You must be logged in to open the attachment.

Download Article
Comments about this Article
You must be logged in to add or view comments.
Related Articles
Feedback Form
How did you apply this information?
You must be logged in to use this feature
Is this article applicable to your organization?