Groundwater Sampling Conducted Incorrectly
5298 Views
Feedback
0 Comments

Favorite
Image for Groundwater Sampling Conducted Incorrectly

Type:  Lessons Learned

Publisher:  Babcock & Wilcox, Pantex-B&W

Published As:  Public

Date: 

Topics:  Environmental Protection, Operations, Work Management/Planning

A transposition error in a work scheduling spreadsheet caused collection of five extra groundwater samples including one that produced an unexpected result for hexavalent chromium. Additionally, 12 required samples were not collected as a result of the spreadsheet error. The errors were discovered soon enough to be corrected however, the unexpected result required additional regulatory notifications and re-sampling.

You must be logged in to open the attachment.

Download Article
Comments about this Article
You must be logged in to add or view comments.
Related Articles
Feedback Form
How did you apply this information?
You must be logged in to use this feature
Is this article applicable to your organization?