Air Handling Unit Replacement and Lack of Position Verification Leads to Bridge Crane Interference
5880 Views
Feedback
0 Comments

Favorite
Image for Air Handling Unit Replacement and Lack of Position Verification Leads to Bridge Crane Interference

Type:  Lessons Learned

Publisher:  Fermi National Accelerator Laboratory, Batavia, IL (Fermi National Accelerator Lab)

Published As:  Public

Date: 

Topics:  Engineering, Operations, Construction/Project Management, Work Management/Planning

When installing, replacing, or modifying equipment or structures be sure to check for interferences with other equipment and personnel before completing the task. During installation, construction, modification, always leave the equipment in a safe state free of interferences and other hazards when leaving the worksite or placing the task in standby.

You must be logged in to open the attachment.

Download Article
Comments about this Article
You must be logged in to add or view comments.
Related Articles
Feedback Form
How did you apply this information?
You must be logged in to use this feature
Is this article applicable to your organization?