Topics:  Electrical, Environmental Protection, Contracts and Procurement, Construction/Project Management

An abandoned communication line was struck with a backhoe bucket during pad preparation. Due to manpower limitations, the excavation was being conducted during the backshift when specific personnel assigned to the activity were available. The abandoned conduit was struck while the backhoe was being used to remove blacktop and soil from the area. The next day an electrical conduit was uncovered when continuing the excavation. Although the conduit was not damaged, work in the area was immediately suspended pending further investigation.

You must be logged in to open the attachment.

Download Article
Comments about this Article
You must be logged in to add or view comments.
Related Articles
Feedback Form
How did you apply this information?
You must be logged in to use this feature
Is this article applicable to your organization?