Open Air Demolition of Asbestos Gunite by Using Track Mounted Wet Cutting Saw
7271 Views
Feedback
0 Comments

Favorite
Image for Open Air Demolition of Asbestos Gunite by Using Track Mounted Wet Cutting Saw

Type:  Best Practice

Publisher:  Energy Facilities Contractor Group

Published As:  Public

Date: 

Topics:  Respiratory Protection, Construction/Project Management, Radiation Protection, Deactivation and Decommissioning

The use of a track mounted wet cutting saw reduced the need for respirators and additional PPE during this D&D operation and eliminated Health & Safety concerns encountered during typical asbestos removal operations. By using this method, the D&D workers were kept at a safe distance during the size reduction operations since the cutting saw was mounted on tracks on the outside wall of the structure.

You must be logged in to open the attachment.

Download Article
Comments about this Article
You must be logged in to add or view comments.
Related Articles
Feedback Form
How did you apply this information?
You must be logged in to use this feature
Is this article applicable to your organization?