Inoperable Seismic Latch on IEM Cell Leads to DSA Non-compliance
3942 Views
Feedback
0 Comments

Favorite
Image for Inoperable Seismic Latch on IEM Cell Leads to DSA   Non-compliance

Type:  Lessons Learned

Publisher:  Fluor Hanford, Richland, WA

Published As:  Public

Date: 

Topics:  Nuclear/Nuclear Safety, Operations, Management Systems

The Shielded Cell Transfer Cask (SCTC) was removed from the Interim Examination and Maintenance (IEM) cell at the Fast Flux Test Facility and replaced with a cover plate while a seismic latch on the ceiling valve was inoperable. The latch was required by the documented safety analysis (DSA) to be operable during that evolution.